Hi "bobboone",
simply place 2 switches (horizontally or vertically) on to your layout so that this looks like a double-crossing.
After that enter ONE address to ONE of the switches and WDP automatically recognize that this is a double crossing (and shows this in the appropriate window of solenoid devices within the track-editor).
Regards
Ruediger