Hello everyone. My name is Lee. Firstly I would like to say hello to everyone as I am new here. Also I would like to congratulate Windigipet on a superb product.
I live in Spain and have been useing the Spanish demo version for approximately 9 months and little by little things have been advancing happily.
Lately I have a niggly little problem. The situation is that I have two trains on an oval track. On one side of the oval is a two track siding and on the other side is a three track station. That is with two sets of three-way peco points. I have a route that means one train (Train 1) is in the station on track one waiting. I now want the the other train (Train 2) to arrive at the station at track two and stop. When this happens I have an option on Train 2 that changes a signal that creates the condition for train 1 to start (profile-switch to green) in the opposite direction from train 1.
The problem is that before train two arrives to the destination point, where in the route profile, the signal/solenoid, should have a ten second delay to allow all the carriages to enter platform/track2, the points and signal/solenoid change as soon as train one enters track/platform two. The result is that the points change before all the carriages have entered the track/platform 2 and resulting derailment. How can I delay points/solenoid/signal change. Obviously there is something I am not doing correctly (thats normal).Can someone help with this annoying problem please.
Thank you and regards to everyone on the forum.